Utah Olympic Park

Construction Updates

The Utah Olympic Park is embarking on a number of facility improvements and construction projects as we prepare for 2034.

Upcoming Projects

at the Utah Olympic Park

Hotel & Office Building Project

In partnership with Utah Development & Construction, construction of the new hotel project will begin in April 2026 at the location of the current Legacy Center adjacent to the Quinney Welcome Center and Olympic Plaza. Please see the renderings below.  More details to come on the hotel project.

Hotel Renderings

Hotel Layout Around Existing Pool Area

Office Building Layout

North

Entrance Looking Northeast

Entrance Looking West

Southeast

Sliding Track Updates

Track Shade and Lighting (2026 – 2028) –Create a modular roof system with integrated shades that can be opened or closed as conditions dictate, this roof system would run the length of the track and be either cantilevered over the track or fixed on both sides, this would ideally be fabricated off site and installed in sections, freestanding from the existing track structure. Integrated into this roof system would be a lighting system sufficient to meet the TV quality lighting standards.

Remaining Track Roof and lights top 1/3 (2029-30) – Complete remaining section of track above Women’s start including Men’s luge start section.

Benefits – provide more consistent sliding conditions, improved energy efficiency, reduced ice maintenance costs, improved spectator experience